Network workspace
Build a topology that writes the interface plan.
Add devices, connect them with validated network intent, and let the workspace suggest unused interfaces and routed subnets before generating every device configuration.
Addressing
IP planner
Intent layer
Network services
Define a VLAN, OSPF fabric, or infrastructure baseline once, then generate coordinated sections for every participating device.
Topology addressing and interface assignments have no blocking conflicts.
No network-wide services are defined. Device and link configuration still works independently.
Devices
Configure one device at a time
SW1 / Essentials / Core
Base system
Identity, local admin, SSH, console, and safe defaults.
Pre-deployment review
A candidate is a starting point, not a change ticket.
- Confirm interface names and feature support on the target platform.
- Check overlapping objects, route policy, and management reachability.
- Capture state, define rollback, then verify before saving.
Maintenance planning
Turn the candidate into an executable change plan.
Review command intent, risk flags, rollout order, verification, and rollback guidance without connecting to a device.
Exports stay local to this browser. No commands are sent to network devices.
Step 1 · Access switch
SW1
192.0.2.10
Choose a platform family before treating this preflight as evidence of compatibility.
Record the IOS or IOS XE release so feature support can be checked against the exact release notes.
There is no generated change set to evaluate for this device.
No high-impact command pattern was detected; platform review and verification are still required.
# No planned commands for this deviceshow clock
show version
show ip interface brief
show running-config
show archive
show interfaces status
show vlan brief
show spanning-tree summaryshow version
show ip interface brief
show logging
show interfaces status
show vlan brief
show interfaces trunk
show spanning-tree summary05Rollback planning aidPlatform-dependent archive and timed revert patternReview guidance
Capture a verified full baseline, confirm flash capacity and archive settings, and test the recovery path. The commands below are never run by this app.
! Planning aid — validate syntax and storage on the target IOS / IOS XE release
! Profile: Unspecified · Release: not recorded
! Capture a known-good full configuration as flash:sw1-baseline.cfg before the window.
archive
path flash:archive
maximum 10
write-memory
!
! Optional timed rollback pattern — do not paste until platform support is confirmed:
configure replace flash:sw1-baseline.cfg force revert timer 10
!
! After post-change verification succeeds:
configure confirm